Track and Systems Construction Contract Award (HSR25-89)

CHSRA awarded Contract HSR25-89 for Track and Systems Construction Contract with notices to proceed for Package 1B and Package 2 in June 2026

procurement confirmed background
CHSRA Board Materials
Jun 15
90

CHSRA office moving and modular furniture services contract

California High-Speed Rail Authority has posted solicitation HSR26-03 for as-needed office moving, storage services, and freestanding modular systems furniture reconfiguration with bid deadline July 1…

procurement confirmed watch
Cal eProcure CHSRA
Jun 15
80

CA HSR Authority advancing track and systems design phase

California High-Speed Rail Authority is moving closer to designing track and systems, indicating upcoming procurement opportunities for engineering and design services.

procurement strong_indicator watch
Industry News
Jun 14
90

Federal Railroad Administration terminates $4B in federal grants for CA HSR

The Federal Railroad Administration has terminated $4 billion in federal grants for the California High-Speed Rail project.

funding confirmed act_now
Industry News
Jun 14
70

CA HSR preparing to court private financiers with $1B annual funding

California High-Speed Rail is preparing to engage private financiers, supported by $1 billion annually from California state funding.

p3 strong_indicator watch
Industry News
Jun 14
45

CHSRA business plan allegedly violates state law

California High-Speed Rail Authority's latest business plan is reported to violate state law and raise questions, though specific violations are not detailed in available content.

government early_signal watch
Industry News
Jun 14
65

CA HSR CEO takes leave following arrest

California High-Speed Rail Authority chief executive has taken leave of absence after being arrested on domestic violence allegations.

government confirmed watch
Industry News
Jun 14
80

CA HSR faces $86.8 billion funding shortfall

California High-Speed Rail Authority is continuing project development despite facing an $86.8 billion funding gap.

funding confirmed watch
Industry News
Jun 14
80

California HSR faces $86.8 billion funding shortfall

California High-Speed Rail Authority reports an $86.8 billion funding gap while continuing project development

funding confirmed watch
Industry News
Jun 14
90

CHSRA Office Moving and Storage Services Procurement

California High-Speed Rail Authority posted solicitation HSR26-03 for as-needed office moving, storage services, and modular furniture reconfiguration with bid deadline July 1, 2026.

procurement confirmed watch
Cal eProcure CHSRA
Jun 13
80

California HSR faces $86.8 billion funding shortfall

California High-Speed Rail Authority is proceeding with project despite an $86.8 billion funding gap between current resources and total project costs

funding confirmed watch
Industry News
Jun 13
75

Heavy Maintenance Facility Site Selection Process Underway

At the June 1, 2026 board meeting, CHSRA presented an overview of the Central Valley Heavy Maintenance Facility site selection report, indicating an active facility planning and site screening process…

consultant_need strong_indicator watch
CHSRA Board Materials
Jun 13
85

Construction Package 2-3 Change Order Approved (DFJV Settlement)

CHSRA Board approved Change Order #427 for Construction Contract 2-3, described as a DFJV Settlement Change Order (Resolution HSR 26-06), at the April 29, 2026 meeting.

procurement confirmed background
CHSRA Board Materials
Jun 13
85

Architect-Engineer IDIQ Pool Contract solicitation released

Board approved release of Request for Qualifications for Architectural & Engineering Services under Indefinite Delivery Indefinite Quantity Pool Contracts at the March 4, 2026 meeting.

consultant_need confirmed watch
CHSRA Board Materials
Jun 13
85

Cable Troughs Materials Contract procurement approved

Board approved Resolution HSR #26-05 to release invitations for bids and award Contract HSR25-117 for Cable Troughs Materials at the April 29, 2026 meeting.

procurement confirmed background
CHSRA Board Materials
Jun 13
85

Track and Systems Construction Contract awarded to Package 1B and Package 2

Board approved Resolution HSR #26-07 to execute and award Track and Systems Construction Contract HSR25-89 for Package 1B and Package 2 at the June 1, 2026 meeting.

procurement confirmed background
CHSRA Board Materials
Jun 13
100

CHSRA seeking office moving and storage services contract

California High-Speed Rail Authority has posted solicitation HSR26-03 for as-needed office moving, storage services, and modular furniture reconfiguration with bid deadline January 7, 2025.

procurement confirmed act_now
Cal eProcure CHSRA
Jun 13
45

Gubernatorial candidate proposes new plan for CA HSR after missed 2020 deadline

A California governor candidate is calling for a new plan for the high-speed rail project following its missed 2020 completion deadline.

government early_signal watch
Industry News
Jun 13
100

CHSRA soliciting office moving and furniture services

California High-Speed Rail Authority posted solicitation HSR26-03 for as-needed office moving, storage services, and modular furniture reconfiguration with bid deadline January 7, 2026.

procurement confirmed act_now
Cal eProcure CHSRA
Jun 13
80

Valley Rail Program Component Modifications

TIRCP amendments show deallocations from Valley Rail Madera Station ($19K PS&E) and Phillips Siding Rehabilitation ($215K PS&E) due to savings or alternative funding

funding confirmed background
CTC Meeting Agendas
Jun 13
75

TIRCP Program Shows Active Rail Investment

Multiple TIRCP (Transit and Intercity Rail Capital Program) allocation amendments, supplemental funding requests, and new allocations totaling over $500M across 20+ projects

funding confirmed background
CTC Meeting Agendas
Jun 13
65

High-Speed Passenger Train Bond Program (HSPTBP) Activity Anticipated

CTC June 2026 agenda notes that rail signals typically appear in the last 10-20% of items, with HSPTBP referring to Prop 1A bond money for high-speed rail

funding early_signal watch
CTC Meeting Agendas
Jun 13
100

CHSRA office moving and furniture reconfiguration services procurement

California High-Speed Rail Authority has posted solicitation HSR26-03 for as-needed office moving, storage services and modular furniture reconfiguration with bid deadline January 7, 2026.

procurement confirmed act_now
Cal eProcure CHSRA
Jun 13
45

Governor candidate proposes new plan for CA HSR after missed 2020 deadline

A gubernatorial candidate is proposing a new plan for California high-speed rail following the project's failure to meet its 2020 deadline.

government early_signal watch
Industry News
Jun 13
25

California High-Speed Rail announces billions in economic benefits

California High-Speed Rail Authority issued a news release highlighting billions in economic benefits from the project.