75
Draft Environmental Document Released for LA to Anaheim Segment
consultant_need
strong_indicator
watch
HSR Newsroom · Jul 05
Summary
CHSRA released a Draft EIR/EIS for the 30-mile Los Angeles to Anaheim segment in December 2025, opening a public comment period and signaling the segment is advancing through environmental review.
Details
Draft EIR/EIS publication is a precursor to final environmental clearance and subsequent design-build procurement, positioning consultants with Southern California rail expertise for upcoming work.
Toward environmental review support, technical analysis, public outreach, and eventual design and engineering for the LA-Anaheim segment
California High-Speed Rail Authority
—